Dei/Sole 24 Ore – South Africa: TerniEnergia signs 2 solar panel installation contracts
TerniEnergia signed two contracts for the construction of industrial-size solar panel installations with a combined power potential of 148.5 MWP (Megawatt-Piek). The contracts call for TerniEnergia Projects, under the control of TerniEnergia South Africa, to build the installations through “EPC contracts”, i.e. turn-key operations, for an overall value of 147 million euro. (Il Sole 24 […]
Read more
