This site uses technical, analytics and third-party cookies.
By continuing to browse, you accept the use of cookies.

Preferences cookies

Brasilia: third stage of “Green Embassy” project under way

The third stage of the “Green Embassy” project was launched today. The initiative, strongly supported by the Italian Embassy in Brasilia, was introduced in 2010 with the installation by EnelGreen Power of 405 photovoltaic panels that enable a saving of 7.6 tons of CO2 emissions each year. Read more, in Italian.